How Can We Help?

8. Integrated Achievement(사업종합실적)

You are here:
< All Topics

@. ASP

refer ASP: http://www.sappdi.or.kr/manager/performance/07_1.asp

0. Storyboard

view storyboard in pptx

 

A. List

1. Introduction

Transaction Admin Pages have separated 3 part

  1. before/after construction consultation management : building permission / use permission
  2. miscellaneous consultation management : education, survey, use permission pre-check
  3. statistics : Integrated Achievement

A building can have multiple separated usages by partition of buildings. This is why usages consultation of construction permission should be reported separately by usage. Hence technical consultation for one building is only one for all buildings while usage consultation can be one or more than one for all buildings. This makes count of whole usage list is always same or greater than count of technical consultation. So it does for use permission of technical consultation and whole usage list.

Another characteristic is that tbl_build_report table has shared by tbl_build and tbl_used because there is no different in table field items between construction permission and use permission.

HeadTable->SubTable structure

  1. tbl_build -> tbl_build_report
  2. tbl_used -> tbl_build_report

 

2. Data Dictionary

data components

(a)seq-no
(b)period
(c)total count for technical consultation of construction permission : total count of buildings
(d)total count for partial usages of buildings
(e)total count for technical consultation of use permission : total count of buildings
(f) total count for partial usages of buildings
(g) total count for civil complaint consultation
(h)total achievement for education and PR
(i)total achievement for  factual survey
(j)total achievement for use permission of pre-check
(k)sum of total count.
(l)district:
(m)title
(n) do not show (delete this item)

functional components

(c)area-select
(d)start-date
(e)end-date
(f)search-button
(g)clear-search-field
(h)search-word-Input
(i)print

  • print view page when click on print buttojn

 

Previous 7. Factual Survey-Etc(실태조사 기타)
Next 9. Usage Permission Pre-Check(사용승인 사전점검)
Was this article helpful?
0 out of 5 stars
5 Stars 0%
4 Stars 0%
3 Stars 0%
2 Stars 0%
1 Stars 0%
How can we improve this article?
Table of Contents